What's in the game, and what's coming
What's in the game, what's coming next, and the ideas for later. Each new build ticks things off. It's the same list as the Roadmap on the game's title screen.
In the game now 136
A quick word
The small things a boss gets asked all day. Someone on the floor sticks their head up: these gloves have had it, can we change the radio station, it's somebody's birthday so how about a cake for smoko, any chance of a sausage sizzle on Friday. Or the phone goes for you: the footy club after a sponsor, the tool truck out the front, the high school with a work experience kid. Each waits as a face on the console with two or three answers. A few dollars against how the crew feel, or a little for your name around town. Never much either way, and one you don't get to is gone by the morning. Most days there's one in the afternoon, which used to be the quietest part of the day, and some days one mid-morning.
The phone rings through the day
Every request for a price used to come in at 7am, all at once, and then the phone sat quiet till the next morning. Now the day's first call comes as the doors open and the rest ring one at a time through the morning and into the afternoon, up to half past two. The same number of customers ring; there's just something to answer through the day. A rush job still rings first thing, since it can't wait.
Days off go by quick
A weekend used to take as long as two working days, with the crew at home and next to nothing to watch. Now a day off (the weekend, a public holiday, the Christmas shutdown) goes by three times as fast, at whatever speed you've picked, and the date shows >> while it does. It holds off while there's anything waiting on you: a card up, someone at the counter, a window open, a shed being laid out. Only the clock on the wall changes: what the Boss gets done on a Saturday is the same. Click the date on a day off to keep them at the usual speed.
Workshop sight gags
Every day or two something small and daft happens on the floor. Somebody drops something with a clang, and the whole shop turns round and gives them a clap. A welder picks one up before it's cooled. Somebody pinches a finger and the bloke next to them thinks it's hilarious. The apprentice gets sent to stores for a long weight, or a tin of striped paint. Somebody has a dance to the radio. And when a machine packs it in, now and then its operator gives it a kick and hops about holding their foot. On a Friday arvo the floor gets a bit of a dance on. None of it costs or earns anything.
The crew show what just happened
A job out the door on time gets fists in the air and a clap; a late one gets heads shaken. When a machine packs it in, whoever's on it throws their hands up and the rest of the bay looks round. Work sent back has that trade with a hand over their face. A pay rise is a jump for joy and a knock-back is a stomp. Everyone jumps when the extractor catches fire or the power drops out, and wipes their brow when it's sorted. New starters get a wave, people stretch before lunch and before heading home, anyone with a speech bubble talks with their hands, and when the level's won the whole shop goes up.
Body language
You can read the crew from the other end of the shed now. Someone stoked walks with a spring in their step and their arms swinging. Someone fed up slouches along with their hands in their pockets, kicks at the floor and stops to shake their head at the job. Someone knackered stoops, drags their feet and wipes their brow. Anyone on a job that's due today or overdue leans into it with short quick steps. Couriers hurry, and a customer who came in about a late job walks out the way they feel.
Arcs and lasers glow
A welding arc, the spot where a laser or plasma torch meets the steel, and the lamps and headlights at night are brighter than white now, and the light blooms off them the way it does through a camera. On a computer; phones and tablets keep the plain look for now.
Light that shows the concrete
Sunlit driveways, aprons and slabs used to burn out to plain white. The light's been rebalanced so concrete is a pale grey you can see the grain, stains and saw cuts in, the shadows have a bit more depth, and the grass is a touch less neon.
Dress the yard
Build has an Outside tab from the factory unit on: garden beds, hedges, planter boxes, a bench, a picnic table, a sign with the business's name and a flagpole, for the grass beside the car park and past the end of the apron. The better the place looks from the street, the more walk-in customers pull in, up to a fifth more. A picnic table makes lunch that bit better too.
The neighbours are busy too
The shed next door on the estates has its own name on the wall, cars out the front, pallets by the roller door, a forklift in and out, a few of its people about (and out the front at smoko), and a van or a truck up its driveway with a delivery. At the garage, the bloke down the street mows his lawn, the neighbour up the street tends the flower beds, and the kids kick a ball about once school's out. Click any of them for who they are.
Soft shade where things meet
Machines, benches, racks and people used to sit on the floor like stickers. Now there's a soft shade where a machine's foot meets the slab, in the corner where two walls meet, under a bench and along the bottom of every wall, so everything looks like it's standing in the shed.
Gardens and hedges
The outside of every place looks kept now. The garage has roses up the front path, a low hedge along the front and a veggie patch out the back, and the neighbours have their own hedges, flower beds and a bird bath. The estates have planted beds along the front either side of the driveway, a hedge down the side of the car park, street lights, the estate's sign, and a bus stop up the road. The city has planters, benches and bins on the footpaths.
The street out the front
There are people on the footpath and traffic on the road on every level now. In the suburbs the neighbours walk past with dogs and prams, kids go by to school and home again, and the postie stops at the letterbox. On the estates it's people from the sheds up the road walking to the servo, utes, vans and the odd truck. The city's busy and the bush is quiet. Traffic pulls up for the supplier's truck and goes round what's parked. Click anyone for who they are.
Steel that looks like steel
Everything in the shop used to be one flat colour. Now bare steel, galv and stainless have a sheen and a rolled grain, machine paint has a gloss that catches the sun, glass glints, and brick and timber have a bit of weather in them. The sheet on the rack and the parts on a pallet look like metal till they're painted. The slab is real concrete: mottled, stained here and there, with saw cuts between the bays, and every machine has left its patch of grime where it stands.
Prices wanted, on the console
With the order book folded, customers waiting on a price are one button on the console with a count on it, blinking when a new one rings. Click it and the first one stands on the console to price, with Next for the others and Later to put it away. Someone at the counter still comes up by themselves. A phone keeps its line in the order book.
One readout for money, our name and the date
The console's readout is one block now: the money, a bar for our name around town that creeps red to green as it moves (click it for Customers), and the date with how hot it is in the shed. The console is a sixth slimmer, so more of the screen is the shed.
Faces on the console
Someone wanting a word (a pay rise, time off, their notice, retiring, a forklift without a licence) turns up as their face on the console with a badge for what they're after, and waits there blinking till you click it. Their card stands over their face, and Later folds it back down. The shed stays clear while they wait.
Welding screens
An amber welding curtain on a wheeled frame, from Build under Safety. A MIG or TIG welder with other machines within 6 metres and no screen flashes the people working beside it: they lose a little mood every day, now and then one cops a flash to the eyes, and it's on the WorkSafe inspector's sheet.
A seat for everyone at lunch
The smoko room's card rates it, counts its seats (four at a table, three on a couch) against the half of the crew that sits down at a time, and says what would lift it. A seat for everyone makes lunch do the crew more good.
Tool store
A lockable mesh cage from Build. Tool shelving in it keeps the cordless drills, grinders and batteries locked up overnight, so a break-in doesn't get them. At the works and the plant a tooling rack keeps the press brake, punch and machining tooling in order, and every set-up is a fifth quicker.
Toilets and a first aid room
Two more rooms from Build. The shed's own toilet does for ten people; past that the crew queue, everyone works a bit slower and gets cranky, and it's on the WorkSafe inspector's sheet till there's a Toilets room with a cubicle for every ten more and a hand basin. A first aid room with a treatment couch and a cabinet lets your first aider patch up more cuts and burns on the spot, gets the rest back a day sooner, and WorkSafe want one once there's fifteen on the crew.
Click a room
Click the floor of any room for its card: what it's for, how big it is, what's in it, what it still needs before it's any use, and who's in there right now. Door left and Door right shift its door along the wall half a metre at a time, and Take it out pulls an empty room down for half its cost back (it asks twice).
Real rooms
The office, smoko room, drawing office, QA room and control room are proper rooms now: stud walls with windows on the far sides, a low wall with glass over it on the near sides so you still see who's in there, the room's name over the door, and a door that swings open for whoever walks up to it. Rooms in games you've already saved get them too.
Price it at the counter
Click a walk-in customer waiting at the door and their request is on their own card: what they want, your price and date, the chance it wins and what it makes, with Give price and Pass. No trip to the order book, and it fits a phone.
Click the truck
While the truck's backed in, click it for what it brought, what's loaded to go and what that's worth, and what's still to come out to it. A finished pallet at despatch says when the truck's coming, and Call the truck brings it now for what's ready rather than waiting for a load.
Click a pallet
Every pallet of work on the floor can be clicked: whose job it is, what's on it, where it's waiting and what's still to do, when it's due and what the job's worth. Do this job first sends it to the top of the order book from right there, and pale arrows show the rest of that job across the shed. In the garage the trolleys and the finished pile say what's on them.
The crew's mood on their faces
Everyone on the crew wears a small face over their head all day: happy, okay, fed up, or worn out. One look across the floor tells you how the shop's feeling, without opening a card. Anyone stood about with nothing to do taps a foot and checks their watch.
Comings and goings
From the factory unit on, the shop has callers all day: a courier's van with a carton for the welders or the office, reps from the steel supplier and the machine dealer with news worth having, job seekers dropping in a résumé, customers in to see how their job's going (and not happy if it's late), and the scrap man on Fridays to weigh the skip. They wait their turn outside the office, and the truck driver hops down with the docket while the forklift unloads.
The shed has the screen
From Level 2 on a level opens close in on the machines, so the crew are people and not specks, with the whole shed a wheel-scroll away. The order book folds down to a line, with a line for each customer wanting a price, and the goals fold down to a bar each. Open either and it stays how you left it.
Rail and marine fit-out
The rail maintainers order carriage seat frames, welded by a coded welder and signed off by QA like the plinths, and aluminium lining panels for the carriage walls. Boat builders and the marine fitters order aluminium deck hatches, TIG welded with a gasket channel round the frame, from the factory unit on.
Street furniture
Councils and the parks people order bike racks and park bench frames in RHS from the works on: lengths mitred on the cold saw or cut on the tube laser, drilled and welded up. They ring once there's a tube machine to cut them.
Commercial kitchens
Stainless work for the kitchen fitters, from the factory unit on: exhaust canopies over a cooking line, folded in panels and TIG welded up with a grease gutter and filter rails, tub sinks let into a bench top, and splashbacks by the stack. Bayside Commercial Kitchens, the outdoor kitchen people, the food factory and the city's shopfitters order them, once there's a guillotine and a TIG welder for the stainless.
Roofers', landscapers' and ute work
Three more products for the farm shed and the factory unit. Gutter brackets for the roof plumbers, by the box. Garden edging in 2.4 m lengths for landscapers, councils and farm supply stores, which only a long folder or a long press brake takes (and in corten at the city shop). Ute drawer units for Kev's, notched, folded and welded like the toolboxes.
Checking the work
From the factory unit, put an inspection table in and send a hand on the Inspection course, or take on an inspector. They check the first one off each job at the machines, so the floor makes fewer mistakes, and spot check what's waiting at despatch, pulling bad lots before they go. The new Quality tab in Customers shows how much of the work is right first time, what QA caught and what came back, and which section the faults come from.
The big-bed fibre laser
From the highway new build on, a 10 kW fibre laser on a 6 m bed, the only cutter that takes a full 6 m sheet of plate. Conveyor stringers and welded beams come off it in one length with no splice, and the conveyor builders and steel builders who want them ring once it's in.
Builders' retention
A builder's year of work from a site visit comes with retention, the way Aussie builders do it: 5% of every lot's invoice is held back. Half comes back when their job's finished and the rest at the end of the six-month defects period, unless they reckon something of ours needs fixing. Then it's your call: send someone round to fix it, let them keep it, or take it to adjudication. Lose the contract for late lots and they keep the lot. Finances (Owed to us) and Customers show what each builder's holding and when it's due back. Not on Easy.
Fair high scores
Every score is checked against the rest of your save before it goes on a board, and a level or challenge only counts when it's been saving online from its start, at the pace the game really goes. Levels won is counted by the website from your wins on the boards, and test games stay off.
Col's walk-through for moving in
Every level that starts in an empty shed has Col walk you through setting it up, like day one in the garage: a bay for each trade, then the stores, despatch, office and smoko room, the fit-out in them, and the gear he'd get, with his arrow on the very button each time. Then the clock starts and he shows you the first job's traveller on the floor. Skip tour whenever you like, and once you've won a level past the farm shed he asks first.
Steadier lead times
From the factory on, Priya's "about N days" no longer comes down under the sums while there's more than two weeks' work on the books. The first quick little jobs used to talk her into promising too soon, the shop booked more than it could get through, it all went out late and your name went with it (the high-spec plant could sit in the red for months).
Pictures of your shop
Each saved game's card shows a picture of your shop, taken mid-morning with the crew at work: on Saved games, and side by side when you pick between the game in your browser and your online one.
More big moments
Four more of the big moments, each your call. A spark sets a fume extractor's filter alight: get everyone out and ring 000 (the floor stops, the brigade comes and WorkSafe follows), or grab the extinguisher if there's one handy. The electricity network's turning the power off for most of a day: hire a generator, or make it a clean-up and maintenance day. Someone breaks in overnight for the stainless off the rack and the power tools: claim it, wear it, or put in cameras. And the local TV news wants to film the floor: whatever's on camera, a guard off included, is on at six.
Apprentice incentives
Sheet metal's a trade the country's short of, so the government pays the shop $2,500 for taking on an apprentice, the real Priority Hiring Incentive: $1,250 halfway through their first year with you and $1,250 at the end of it, as long as they're still with you. The claim goes in when it's due and the money comes a fortnight later, or a week with an HR manager on it. The job list and the hover show it, and so does their card.
An HR manager
At the works and the plant, an HR manager now and then on the job list (more often once there are a dozen or so on the books). Put an HR desk in the office for them and they take the crew admin off your hands: pay rises (what they're worth), leave (yes, unless the trade's short then), a word with anyone fed up and talking round anyone who hands in their notice, and booking courses one at a time when there's money for it. Each one is theirs or yours, from their card. They do the hiring too: no agency fee, and more faces on the job list each week.
More thicknesses
Each metal in a lighter and a heavier gauge as well as its usual: 1 mm and 3 mm galv, 1.2 mm cold rolled and 3 mm mild steel, 0.9 mm and 3 mm stainless, and more, each with its own price and lot on the rack. 3 mm is slower to cut, drill, fold and weld and pays more, and it's too thick for the treadle shear and the pan brake: it wants the guillotine and a press brake.
Challenge starts
Set games with a story and their own High scores board, the same start for everyone: Murphy's on a shoestring (fix the roof and get going on nothing but the overdraft, fewest days wins), the building slump (six months of half the work, most in the bank wins) and Kev's rush month (thirty days of Kev wanting it yesterday, most work shipped wins).
Three save slots
Saved games on the title has three slots, so an Easy shop and a Hard shop (or a challenge) can be going at once. A new level or challenge offers to start in an empty slot, and signed in, every slot has its own online save.
Workers comp that follows your record, and payroll tax
Workers comp is a share of the wages at the real rate for sheet metal shops, moved up or down a step each 1 July on what WorkCover paid out for people off hurt: a clean year comes down, a bad injury goes up. Someone off hurt costs you their first week, and WorkCover pays the rest back. Finances has a Workers comp tab with where your rating's heading. On Hard, Queensland's payroll tax once wages top $1.3 million a year, taken each month. Apprentices' wages count for neither. Easy stays on the industry rate.
A small powder booth
The factory unit gets painted work: council bin housings, bollard covers, BBQ hoods in satin black and window hoods in the house colour. It goes out to the powder coater at first, then into your own small powder booth ($24,000, in a finishing bay out the front): the work's wiped down, hung on a wheeled rack, sprayed in the booth and wheeled into a little electric oven to cure. A powder coater turns up among the job seekers to run it. BBQ hoods come four to a lot and window hoods eight, priced like the premium painted work they are, so they pay as well as the rest of the factory's work.
A new home for the website
The website and the game moved to a bigger host with no limit on file sizes, so the game keeps loading as it grows. Online saves and the high score boards started afresh on the move; games saved in your browser carried on.
End of financial year
Finances has The year: the profit and loss so far and the tax it's heading for. Early June the accountant rings with how it's tracking (gear under $20,000 bought before 30 June comes straight off). On 30 June the crew do the stocktake, and in July her letter has the year's profit and loss, company tax at 25%, what the business is worth and how the year went. Normal pays the tax by itself, Hard pays it or takes a payment plan, Easy just gets the report.
Machines that warn you
A worn machine shows it on the floor before it lets go, so you can see trouble coming from across the shed: a motor starts to smoke, one plume more as it gets worse, the hydraulics weep oil onto the floor, and once it's well worn it shakes and rattles as it works. Its card says what you'd see, and a service clears it.
Bigger rail yards
The rail yards are 144 metres across now, with room past the laser for more robot cells, the robot coat line and a second panel bender as the shop grows.
Busier shops
From Level 4 the phone rings more the more people you have on the books, and each job is sized for your crew. By the plant you're quoting several jobs a day, about what a real shop that size does.
Eight new machines
A box and pan folder and a 2.5 m long folder at the farm, a CNC press brake at the works, a truck spray booth at the body works, a bevel-head fibre laser, an edge-rounding machine and a 5-axis machining centre at the high-spec plant, and a robot panel bender at the rail yards.
A gear ladder
Every level brings new gear, from a 1.25 m pan brake in the garage to a robot panel bender at the rail yards, and once a machine's on sale it stays on sale. Gear that comes in several sizes says its size in its name.
Buying steel forward
From the factory on, buy a truckload of sheet straight off the mill at the volume price: cheaper a sheet, but it's paid on the day and takes half the rack till the jobs use it, so it pays before a price rise and stings if steel comes down. Win a builder's year of work and choose a fixed price or a steel price clause that moves each lot's price with the sheet; the rail contract has the clause written in.
A market that moves
Building booms and slumps, the mines flat out or cutting back, drought, rate rises and cuts and steel price jumps, each for a few months, changing who rings and what they pay. Award wages go up each 1 July, and it's all in the paper.
Rival shops that live
The other shops get busy or go hungry and quote to match, grow, ring your best tradie with an offer, and sometimes go under: their customers ring you and their tradies want work, and later someone new opens up. See how each is going under Finances, Local shops.
Sell the business
Win Level 12 and a buyer wants the lot: the yards, the rail contract, the gear and the crew. The offer's the bank and what you're owed less what you owe, the gear, a year's profit times three, and so much for every call-off out on time. Sell straight away or keep going to build it up; the price goes on the Business sold board and the trophy in the middle of the board lights up.
Control room
At the rail yards, a control room from Fit-out with a desk and a wall of screens on every robot, the tower, the carts and the coat line. The robot programmer watches the shop from it and goes on call overnight: a robot that stops in the night is reset in minutes instead of sitting there till morning.
Robot coat line
At the rail yards, a powder line with nobody on it: a robot hangs each piece on the carrier, a spray robot coats it in the booth and the carrier takes it through the oven, day and night. Each new colour's a booth clean-out, and the battery boxes now go through our own line in loco red.
Driverless pallet carts
At the rail yards, a pallet cart and its charger from Fit-out. Nobody drives it: it stages the sheet and moves the pallets on like a forklift, through smoko, after hours and on the weekend, keeps the robot weld cells fed through the night, and goes back on charge by itself. No wages, just the power.
Level 12: the rail yards
The old railway workshops, built in 1912, next to the freight yard. A repeat contract with Coastal Freight Rail is signed before you walk in: every Monday a call-off of wagon access steps and locomotive battery boxes comes in, due three weeks later at the contract price, and late ones cost a late fee. Robot weld cells are only sold here, and the robot programmer teaches them like the robot folder. Run the whole shop lights-out, then sell the business.
Level 9: the body works
A long shed on the industrial estate next to the bus depot, building aluminium ute canopies, truck trays and bus roof panels. Every body goes through the assembly section, where the fitters put in the bought-in locks, lights and wiring and test it. Big jobs pay a deposit up front, and a spot welder and a big sheet roller are only sold here.
Level 7: the city shop
A small, dear brick unit down an inner-city laneway, laid out with a fibre laser and a drawing office. Corten facade panels, laser-cut signs and balustrade infills for the architects, who pay over the going rate and send back anything with a scratch on it. A laser welder and a spray booth are only sold here.
Level 5: the mining town
An old steel shed in a coal town out west, laid out with a plate guillotine and a 320T press brake. Plate work for the mines on an ironworker and a CNC plasma table, breakdown call-outs to get the conveyors going, and a crew the mines keep trying to poach.
Level 2: the farm shed
An old machinery shed on a cattle property out of town, with the garage's gear, the Boss and one hand, and no office to lean on. Buy the slip rolls for stock troughs, trailer mudguards and fire pits, and fill the tool board: a corner notcher for ute toolboxes, a grinder and bench, a compressor and rivet gun, and a pallet jack.
Level 11: the high-spec plant
A plant at the business park that's already running, laid out with a sheet tower, a robot press brake, a panel bender, two cobots and a powder line, and a crew who know them. Get it through the ISO 9001 audit, qualify the welding procedures, and win and deliver two defence tenders.
Twelve levels on the board
A board of twelve levels from GO! round to the trophy, and every level starts fresh with its own money, crew, gear and goals, so a fortune made in one can't carry you through the next. Win a level to open the next one, pick Easy, Normal or Hard each time, and race for the fewest days on each level's own high score board. Murphy's and the highway are levels of their own now, and once Level 12's won you sell the business and the trophy lights up.
Defence and high-spec work
At the plant, go for ISO 9001: Priya and the inspector write the quality manual and the auditor comes for the day. Pass and certified work pays more, and with a qualified welding procedure for each process, the defence customers ring: armoured vehicle stowage bins, ship's lockers and radar mounts, all tenders, at the best rates going. That's Level 4 all in.
Cobot welders and the crew's new jobs
At the plant, a cobot weld cell: a collaborative robot with a MIG torch on a two-station table. Someone clamps the parts in while it welds, quicker than a welder and the same every time, but steel only and no certified work. Send a hand on the cell operator course and they can run it; send a good tradie on the robot programming course and they come off the tools to teach the cobots their welds.
The robot press brake and panel bender
At the plant, a press brake with a robot that loads it, folds and stacks the parts on its own, on through the night off the pallets left on its infeed. Each new part is a half-hour changeover, so it's best on long runs. And a panel bender that folds all four sides of a panel nearly twice as fast as a press brake. Both fold only once the CAD/CAM programmer has written the job's bend program.
The sheet tower and the overnight laser
At the plant, a fibre laser with a sheet tower beside it. The tower loads the sheet and takes the cut sheets away, so the laser cuts on its own all day and through the night once everyone's gone home. Someone knocks the parts out of the cut sheets in the morning. If a part tips up and jams it overnight, it sits there till the crew's in and the night's gone.
The plant at the business park
A brand new 88 by 30 metre shed at the business park across town, built for automation, with room for 30 crew. Four big firms on the park ring as soon as you're in, and the jobs are bigger. The QA bench and the CAD desk come with you.
Programs for the press brakes, mill and lathe
At the works the press brakes, the CNC mill and the centre lathe set up for each new part. The CAD/CAM programmer writes a bend program or a machining program for each job, and a setup that took half an hour by hand takes a few minutes. The lathe gets a setup sheet.
Overtime and the arvo shift
From the factory on, keep the day shift back till 5 on weekdays at time and a half. From the works on, put people on an arvo shift, 3 till 11 with a 15% shift allowance, and the gear runs on into the night under the high bays. Tired crew slow down and make more mistakes.
Send an idea
Got an idea for the game, or something not working right? Send an idea on the title screen or the website, and it goes straight to the person making the game. From the game it says which build you're on and how far your game's got, so a problem can be found.
Hard mode tune-up
Hard runs on a real overdraft now: machines, hires, courses and repairs can go on it as long as you stay inside the limit, so a shop whose customers pay at 30 days can still grow. Murphy's sits on an old road by the river and the new build on the highway with the semis going by. The person who draws the jobs up and programs the lasers is a CAD/CAM programmer, in a drawing office, and Col tells you when a laser's standing idle with nobody to program it.
Finance for gear
From the factory on, the big machines can go on an equipment loan: a deposit now and the same repayment every bills day for three years. Easy needs no deposit, Normal a tenth, and Hard a fifth at a higher rate, with a lender who says no if you're past the overdraft or the repayments would swallow too much of a week's takings. Sell the machine and the loan's paid out of the sale.
Forklift licences
Driving a forklift needs a licence. On Hard some forklift job seekers haven't got theirs yet: they're a bit cheaper, but they can't drive till they've done the course. When the pallets back up, one asks to jump on anyway. Let them, and you risk a prang, or a WorkSafe fine if Deb walks in.
Holidays, leave and the Christmas shutdown
Queensland's public holidays shut the shop with the crew on full pay. On Normal and Hard the crew build up annual leave and now and then ask for a week or two off: say yes, or not then (twice running and they take it badly), and leave is paid out when someone goes. In December you pick the Christmas shutdown: Christmas to New Year, a fortnight, or stay open and wear the grumbles. New work all but stops while the builders are shut. Easy just shuts for Christmas.
GST and the BAS
Customers pay 10% GST on top of your price, and most of what the shop buys has 10% on top that comes back on the quarterly BAS. Finances shows the GST you're holding for the tax office and every BAS. On Normal the bookkeeper lodges and pays it; on Hard you do, with a payment plan if money's tight and penalties if it's late. Easy has no GST.
Customers on accounts
Customers get an invoice with each load and pay when it's due: the locals on the day or within the week, trade customers in 14 days, the builders, the council and the big companies in 30. Some pay on time, some run late, and the slow ones pay when you ring them. Finances shows who owes what, with a Ring them button and the debt collector for the ones sixty days over, and the bank lends against what's owed. Hard gives longer terms, more slow payers, nobody to ring them but you, and the odd customer going under owing you money. Easy has none of it.
Easy, Normal and Hard
Pick how you want to run the shop when you start a new game. Easy is for playing for fun: a bigger overdraft, a bank that never shuts you down, Priya sending the quotes and ordering the sheet you don't get to, and customers who forgive a late job. Normal is the game as it's meant to be played. Hard is for running the whole business yourself: a smaller overdraft you can spend on, with two weeks to fix it, no odds on your quotes, your own sheet to order, customers who walk sooner and gear that breaks more. Each mode has its own high score boards.
Phones and tablets
Play on a phone or tablet held sideways: drag to look around, pinch to zoom, tap anyone for their card, press and hold anything to see what it is, and flick through lists with a finger. The on-screen keyboard comes up for your email and ideas, and a Full screen button hides the browser's bars where the browser allows it. Phones get a lighter download and a layout made for the small screen; tablets fill the whole screen. Your online save carries over between them.
Week by week money
A chart in Finances of the money in and out each week, side by side, and what was left in the bank after each bills day. Hover over a week for its sums, or see them as a table.
Crew with small stories
An apprentice who finishes their time gets a cake at smoko. Old hands with 40 years on the tools teach the apprentices, then one day retire: give them a send-off, a card, or ask them to stay. And a footy tipping comp on the smoko room wall, with the ladder on the PA every Monday.
Customers with quirks
Kev always wants it yesterday and pays for it, then rings every day to chase it. The council pays 30 days after delivery but never argues about a late job. The Shed Doctor and Henderson Trailers ring back about every quote to knock the price down: take their price, meet them halfway or hold firm. And get Mrs Patterson's job out on time and there'll be biscuits for the crew.
Murphy's and the highway
Two more sheds, each with a catch. Old Murphy's down on the river: his layout, his worn machines, two of his tradies and his customers' jobs from day one, but a roof that leaks when it rains and no power for a laser till you upgrade it. Or the biggest shed in town, new on the highway: the trailer and rail people ring more, but some old regulars won't come out that far.
QA and certified welding
A QA room with a granite bench and a measuring arm, an inspector who writes each certified job's inspection plan and signs off every lot before it ships (catching the bad ones), and welding tickets for your welders. Together they bring in rail, food, pharmaceutical and marine customers: the best-paying work at the works.
Machining
A machining bay at the works with a centre lathe and a CNC mill (bought, or leased), and machinists to run them: nobody else will touch them. The lathe turns spacers from bright bar sawn on the cold saw, and the bushes in pivot brackets; the mill faces and taps motor bases once they're welded up, and plate base plates off the laser. A pump maker, a trailer builder and a crane builder ring the day you can make their work.
Going broke
The bank gives you an overdraft: $15,000 in the garage, $80,000 in the factory and $150,000 at the works, at 12% a year, so the usual dip while you fit out a new shed only costs some interest. Go past the limit and the bank writes. Still past it four weeks later and it calls the overdraft in and you lose the level, with a go at it again from the day you moved in.
Prices that fit the shop
The factory and the works charge what a real shop would, a little over the garage's prices, instead of two to three times as much. A well-run works keeps about a quarter of what it takes.
A website for the game
sheetmetaltycoon.com has its own front page now, with pictures of each level, a How to play guide, this roadmap and the live high score boards, and the game's a click away at sheetmetaltycoon.com/play. Saves carry on as before.
More hands than work
Each worker's card says how much of last week they stood about with nothing to do. On a Monday when the floor stood about and nothing was holding it up, Col says so and who stood about most. When another machine would clear a backed-up section but its bay is full, he tells you to mark out more floor. And the crew come in early on a Monday and finish the pallet they're on, rather than spending half the day walking the big shed.
What each job made
When a job's out the door the office says what it made or lost, and why: late, sent back, a trade that took twice as long, or priced under cost. Finances lists the last dozen with where the money went, and the hours last week nobody was on a job, so you can tell work that's priced too low from a shop with more hands or gear than work.
Tube: the cold saw and the tube laser
RHS tube on the rack at the works, and two ways to cut it: a cheap cold saw whose work still goes to the drill, or a tube laser, leased or bought, that cuts every hole and slot as it goes but needs the CAD/CAM programmer for each job. It opens balustrade posts, farm gate frames, and pallet racking uprights that only the tube laser can make.
Bigger gear for the works
A CNC punch press that flies through holes but changes its tools over for every new job, a fibre laser twice the CO2's speed that cuts copper and plate, and a quick little 50T and a big 4 m 320T press brake. The dear ones can be leased instead of bought. They open perforated screens, stainless bench tops and chute liners in 6 mm plate, and new customers ring the day you can make them.
The PA and the crew's yarns
Priya's on the PA in the factory and the works, with a bing-bong: smoko and lunch, Monday mornings and Friday arvos, the truck, a breakdown, WorkSafe or a builder on the floor, and the odd announcement nobody asked for. At the garage someone yells out from the house instead. The crew have a yarn over smoko and lunch, in little speech bubbles over their heads, and mutter to themselves at the machines.
Emergencies and big moments
Every few weeks something big happens, and it's your call. A mine rings on Friday afternoon needing conveyor guards by Monday at triple the price: take it, bring the crew in on Saturday, or say no. A builder walks your floor before handing out a year's work, and guards off, a messy floor or people stood about lose it. A whole job comes back with the holes in the wrong spot, and a customer changes the drawing halfway through.
A proper welcome
The website opens on the game's own loading screen instead of the Godot logo: the title over the garage with the crew at work, a progress bar, and Col's tips while it loads. It fades straight into the title screen, and the game has its own icon in the browser tab.
Seeing the bottleneck
Work waiting for a section piles up on painted squares in its bay, a backed-up section gets a red tag with how many pallets and days of work are waiting, Col says who's holding everyone up and what'd fix it, and Where's the work (top left, or B) colours every section green, amber or red.
Quote the job
Customers ring wanting a price, not a yes or no. You start from the going rate in the garage, and from Priya's price and date once she's in the office. Go dearer or cheaper, sooner or later, and the card shows your chance of winning it and what it'd make. Each customer buys their own way, from the cheapest to the date to a shop they know, and big jobs go out to tender against named rival shops. A good name lets you charge more and still win.
Your own powder coating line
A walk-in blast room, a powder booth and a gas-fired batch oven on an overhead rail, in a finishing bay of their own at the works. Painted work goes round it after welding instead of out to the powder coater: no days on the truck, and the powder and gas cost a fraction of the coater's bill. Powder coaters turn up among the job seekers to run it.
Powder coating, sent out
Painted work at the works: litter bin housings, bollard covers and switchboard cabinets. Once they're made the truck takes them to the powder coater, and they come back painted a few days later, straight to the customer on the truck's way out.
The drawing office and the laser
A second-hand CO2 laser for the works. It cuts the holes as it cuts the outline, so its parts skip drilling, but only once the CAD/CAM programmer has drawn the part up and programmed and nested the job, at the CAD desk in the drawing office.
A factory that pays
Factory work pays what a real shop charges for it, so a full floor makes money and the factory can be finished. Customers give you extra time for the move and for remaking work they sent back, and the days-to-finish estimate allows for a bigger crew getting in each other's way.
The works
The big shed at the end of the estate: 64 by 30 metres, empty, room for 20 crew and bigger jobs. Everything comes on the truck and waits in the yard while you lay it out.
The town map
The whole town as a little model, like the map between levels: your garage, the factory unit, the places you could go next and the levels still to come. Click a pin for its card.
End-of-year awards
Every 1 July the Metal Trades Awards judge your year: Safest shop, Best on time and Top earner, won outright or highly commended, and Shop of the year for all three. Prize money, a lift for your name, trophies on Priya's desk, a trophy cabinet under Customers and a Most trophies high score board.
WorkSafe inspections
Deb from WorkSafe turns up unannounced and walks the floor: guards, PPE, welding fumes, extinguishers, a first aider and a tidy floor. A guard caught off is an on-the-spot fine, the rest are notices to fix. The crew pull guards off to go quicker, people get hurt now and then, and Build has a Safety tab with the gear.
High scores
Fastest garage, fastest factory, biggest first year and most jobs on time: top 10 boards for signed-in players, under your shop's name.
Online saves
Sign in with your email (a 6-digit code, no password) and every morning's save also goes online, so your game follows you to any computer or browser and clearing the browser won't wipe it.
Material types
Galv, mild steel, aluminium, stainless and copper, each with its own sheet price and its own lot on the rack. Customers say what they want it made in. Stainless, aluminium and copper need a TIG welder, and the treadle shear won't cut stainless.
Maintenance fitter
Hire a fitter in the factory. Between breakdowns they go round doing maintenance on the most worn machine, and when one lets go they fix it on the spot with no call-out. Tell them which machine to do next from its card.
Riveted steel windows
Riveted steel windows with their titles on dark plates, chunky buttons that sink in when they're on, black readouts for the money, date and news, and a console along the bottom with pictures of the real kit on its buttons.
A tidier screen
One look for every panel and button. Panels have a title and a close button, open one at a time, and light up their button. The order book lines its jobs up with progress bars and folds away, cards show energy, mood and condition as bars, greyed-out buttons say why, the news line keeps the last few messages, and Space pauses.
Research and training
Send the crew on courses (TAFE blocks, trade tickets, a leading hand course), and research jigs, templates and new products: planter boxes, rainwater heads and switchboard enclosures.
Simple and complex jobs
Every product is basic, standard or complex. An apprentice on complex work makes a lot more mistakes, so first and second years are kept off it unless you let them on.
Apprentice to senior
Everyone's somewhere from first-year apprentice to senior tradesperson. Apprentices are cheaper but slower and make more mistakes; the hours on the tools move them up.
Make the shed nicer
Hot summers and cold winter mornings in a tin shed. Fans, heaters, a water bubbler, and a smoko room with a kitchen, coffee, a couch and the footy. Offcuts pile up round the machines till they're swept up or binned; hire a cleaner, and the scrap man pays for the offcuts.
Customers and reputation
Named customers who remember you. Good work on time builds your name around town; late or bad work comes back.
Build your own factory
Move into an empty shed and mark out where everything goes.
The factory unit
Guillotine, press brake, forklifts, pallet racking, and yellow job travellers released by Priya.
Six products
Packer plates, cover plates, kick plates, angle brackets, weld-on brackets and letterboxes.
Crew as people
Smoko and lunch, getting tired, moods, sick days, asking for a pay rise, handing in notice, and getting faster with practice.
Things go wrong
Machines wear and break down, Dave the repairer, late sheet trucks, sheet price changes, rush jobs.
Sound and radio
Every machine sounds like the real thing, left and right of the screen, with the shed's echo; the crew's grinders and rattle guns, the office, trucks and forklifts; the street, the bush or the river outside, crickets at night; and three radio stations with their own songs.
Title screen and How to play
Col walks you through your first day. The game saves every morning.
Weekends off
The crew go home Saturday and come back Monday. The Boss can still work weekends.
Sheet orders
Order sheet yourself or keep it topped up. Real sheet sizes and real yield per sheet.
Click to inspect
Click anyone or any machine to see what they're doing, how they're going and what's next.
Buy and place machines
Shear, drill, pan brake and MIG in the garage. Move them or swap them round any time.
Hire your crew
Pick from the job seekers each Monday, and let people go when you have to.
Real jobs, real money
Take orders, make them, ship them and get paid. Rent, wages, super and bills come out every Friday.
Start in the garage
Day one of the company: the Boss, a double garage and $20,000 in the bank.
Coming next 0
Nothing lined up just now: the next piece goes here once it's picked.
Ideas for later 0
No ideas waiting just now: send one in from the Ideas page.
Updated with every build. Build 207 · 13 Nov 2026. Got an idea that isn't on here? Send it in.